Skip to content
ULTRA1233
XALANT4563
CAYC782

One Holding Entity Three Brands Eight Global Businesses

Eight Galaxies is the parent entity and publisher behind Ultra, Xalant and CAYC, drawn here as one assembly.

Take it apart
Illustration: a machined figure-eight loop standing on vellum drafting paper, eight parts in three brands: the upper loop in brushed aluminium with burnt-orange bands at the joints, the lower loop as three brass wire arcs, the crossing in crimson
ULTRA interactive entertainment 3 parts: Ultra Kingdoms, Ultra Ads, Ultra Data
XALANT autonomous digital infrastructure 3 parts: Edge, Power, Communications
CAYC Web3 exchange and real-world gaming 2 parts: CAYC Exchange, CAYC Island
  • ULTRA interactive entertainment, 3 parts Kingdoms, Ads, Data
  • XALANT autonomous digital infrastructure, 3 parts Edge, Power, Communications
  • CAYC Web3 exchange and real-world gaming, 2 parts Exchange, Island

Eight parts. Three brands.

1
Ultra Kingdoms
ULTRA
PUBLIC BETA
2
Ultra Ads
ULTRA
IN DEVELOPMENT
3
Ultra Data
ULTRA
PUBLIC BETA
4
Xalant Edge
XALANT
PLANNED
5
Xalant Power
XALANT
PLANNED
6
Xalant Communications
XALANT
PLANNED
7
CAYC Exchange
CAYC
LIVE
8
CAYC Island
CAYC
PLANNED
ULTRA 3 parts
XALANT 3 parts
CAYC 2 parts

Three parts are Ultra. Three are Xalant. Two are CAYC.

OPERATING MODEL (PLANNED)

One strategic umbrella: Ultra fuels Xalant's compute, Xalant powers the platform, and CAYC monetizes the ecosystem.

Executive Summary, 2026. Xalant is pre-formation; Ultra is its intended first customer.

1 Ultra Kingdoms
ULTRA
PUBLIC BETA

Public beta live since 17 Jul 2026 on PlayStation; Day-13 report 29 Jul 2026 on track; no later report in any source.

  • ULTRA 3 Ultra Kingdoms, Ultra Ads, Ultra Data
  • XALANT 3 Edge, Power, Communications
  • CAYC 2 CAYC Exchange, CAYC Island
OPERATING MODEL (PLANNED)

One strategic umbrella: Ultra fuels Xalant's compute, Xalant powers the platform, and CAYC monetizes the ecosystem.

Executive Summary, 2026. Xalant is pre-formation; Ultra is its intended first customer.

How to read: brushed aluminium with orange bands is Ultra (3); brass wire with brass bands is Xalant (3); crimson anodized is CAYC (2). The stamp on each part is its stage. As of Ultra 29 Jul 2026, Xalant 11 Sep 2026, exchange confirmation 17 Sep 2026, Executive Summary 6 Aug 2026.

Exploded view

ULTRA, 3 parts

  • 1 Ultra KingdomsPUBLIC BETA
  • 2 Ultra AdsIN DEVELOPMENT
  • 3 Ultra DataPUBLIC BETA

XALANT, 3 parts

  • 4 Xalant EdgePLANNED
  • 5 Xalant PowerPLANNED
  • 6 Xalant CommunicationsPLANNED

CAYC, 2 parts

  • 7 CAYC ExchangeLIVE
  • 8 CAYC IslandPLANNED

Bill of materials

Eight parts, three brands, one revision date. Stages are drawn exactly as the evidence supports.

Bill of materials: eight parts in three brands with stage, next milestone and link
Assembly rule No. Part Assembly What it is Stage Next milestone Link
1 Ultra Kingdoms Ultra Flagship AI-native gaming and i-gaming platform, on console and PC.
Public beta live since 17 Jul 2026 on PlayStation; Day-13 report 29 Jul 2026 on track; no later report in any source.
PUBLIC BETA 24 Oct 2026, commercial launch target ultrakingdoms.com
2 Ultra Ads Ultra Embedded, patent-pending in-world advertising platform delivering brand engagement across every title.
July 2026 plan: rewarded-ad units integrated, not yet live; advertiser pilot planned for beta weeks 5 to 8; 4 advertiser LOIs.
IN DEVELOPMENT 24 Oct 2026, live with commercial launch (target) ultra-ads.agency
3 Ultra Data Ultra A big-data marketing database driving precision targeting and player acquisition.
July 2026 plan: instrumentation and attribution pipeline live inside the beta; audience products not yet validated.
PUBLIC BETA no date; validated through the beta ultra-data.org
4 Xalant Edge Xalant Modular, high-density edge data centers purpose-built for AI training, inferencing and Web3 workloads.
No facility yet; nothing operating (xalant.net, 11 Sep 2026). Deployment playbook dated Aug 2026 (internal).
PLANNED Q1 2027, South Oregon build-out start xalant.net/edge
5 Xalant Power Xalant Off-grid clean power, in the right order: bridge generation and firming today, geothermal and small modular reactors later.
No generation anywhere, no permit filed, no fuel contract (xalant.net, 11 Sep 2026).
PLANNED Q1 2027, build-out start xalant.net/power
6 Xalant Communications Xalant Ka-band satellite community gateways bringing high-capacity internet to underserved markets.
Design intent only; no pad built, no filing held (xalant.net, 11 Sep 2026); workstream began March 2025.
PLANNED Q1 2027, first gateway with the South Oregon site xalant.net/communications
7 CAYC Exchange CAYC Digital-asset exchange and marketplace for trading, rewards and the ecosystem's Web3 economy.
Live at cayc.exchange; owner confirmation 17 Sep 2026 (an automated fetch on 15 Sep saw a blank app shell).
LIVE no date cayc.exchange
8 CAYC Island CAYC Flagship real-life gaming destination: a 400-acre private island off Belize, bridging the virtual worlds into physical experiences.
Escrow recorded Apr 2026 (April 2026 newsletter); title outcome unreported in any later source. GambleStakes, the Web3 casino, is on hold until 2027 and folds in under CAYC Island.
PLANNED Late 2026 to 2027, build-out after Series A No public site yet

ULTRA, 3 parts

1 Ultra Kingdoms
ULTRA
PUBLIC BETA24 Oct 2026, commercial launch target

Flagship AI-native gaming and i-gaming platform, on console and PC. Public beta live since 17 Jul 2026 on PlayStation; Day-13 report 29 Jul 2026 on track; no later report in any source.

ultrakingdoms.com
2 Ultra Ads
ULTRA
IN DEVELOPMENT24 Oct 2026, live with commercial launch (target)

Embedded, patent-pending in-world advertising platform delivering brand engagement across every title. July 2026 plan: rewarded-ad units integrated, not yet live; advertiser pilot planned for beta weeks 5 to 8; 4 advertiser LOIs.

ultra-ads.agency
3 Ultra Data
ULTRA
PUBLIC BETAno date; validated through the beta

A big-data marketing database driving precision targeting and player acquisition. July 2026 plan: instrumentation and attribution pipeline live inside the beta; audience products not yet validated.

ultra-data.org

XALANT, 3 parts

4 Xalant Edge
XALANT
PLANNEDQ1 2027, South Oregon build-out start

Modular, high-density edge data centers purpose-built for AI training, inferencing and Web3 workloads. No facility yet; nothing operating (xalant.net, 11 Sep 2026). Deployment playbook dated Aug 2026 (internal).

xalant.net/edge
5 Xalant Power
XALANT
PLANNEDQ1 2027, build-out start

Off-grid clean power, in the right order: bridge generation and firming today, geothermal and small modular reactors later. No generation anywhere, no permit filed, no fuel contract (xalant.net, 11 Sep 2026).

xalant.net/power
6 Xalant Communications
XALANT
PLANNEDQ1 2027, first gateway with the South Oregon site

Ka-band satellite community gateways bringing high-capacity internet to underserved markets. Design intent only; no pad built, no filing held (xalant.net, 11 Sep 2026); workstream began March 2025.

xalant.net/communications

CAYC, 2 parts

7 CAYC Exchange
CAYC
LIVEno date

Digital-asset exchange and marketplace for trading, rewards and the ecosystem's Web3 economy. Live at cayc.exchange; owner confirmation 17 Sep 2026 (an automated fetch on 15 Sep saw a blank app shell).

cayc.exchange
8 CAYC Island
CAYC
PLANNEDLate 2026 to 2027, build-out after Series A

Flagship real-life gaming destination: a 400-acre private island off Belize, bridging the virtual worlds into physical experiences. Escrow recorded Apr 2026 (April 2026 newsletter); title outcome unreported in any later source. GambleStakes, the Web3 casino, is on hold until 2027 and folds in under CAYC Island.

No public site yet
Bill of materials
Illustration: a vast orbital city, a ring-and-spoke space station above a planet's night side with warm windows and a single orange-gold glow at its hub
ULTRA
Interactive entertainment and Web3 gaming

Play, advertise and monetize across Web2 and Web3.

Ultra Kingdoms is the flagship AI-native Web2 + Web3 gaming platform of Eight Galaxies: interoperable titles on console and PC, in public beta since July 2026. Ultra Ads and Ultra Data are built adjacent to it.

Mobile planned.

1

Ultra Kingdoms

Illustration: a floating cube of terrain half finished as a volcanic kingdom, half still grey wireframe resolving into rock and forest

Flagship AI-native gaming and i-gaming platform, on console and PC.

World Forge, generative world-building
PUBLIC BETA Beta 17 Jul 2026Target 24 Oct 2026
ultrakingdoms.com
2

Ultra Ads

Embedded, patent-pending in-world advertising platform delivering brand engagement across every title.

IN DEVELOPMENT
ultra-ads.agency
3

Ultra Data

A big-data marketing database driving precision targeting and player acquisition.

PUBLIC BETA
ultra-data.org
Illustration: an off-grid infrastructure campus drawn in fine gold wireframe, data-hall modules, a power pad, a solar field and a satellite gateway dish
XALANT
Autonomous digital infrastructure

Powering the autonomous digital frontier.

Planned, all three, as of 11 Sep 2026

Where grid and fiber end, agents begin. xalant.net

Off-grid power, edge data centers and satellite connectivity built as one platform where grid and fiber end. Three companies, one site.

Illustration: a containerized micro data center in gold wireframe, its long side open to show ten server racks
4

Xalant Edge

Modular, high-density edge data centers purpose-built for AI training, inferencing and Web3 workloads.

The hub of the three; Power and Communications are lit from it.

Illustration: an off-grid power pad in gold wireframe, generator containers, solar panels, a battery container and switchgear
5

Xalant Power

Off-grid clean power, in the right order: bridge generation and firming today, geothermal and small modular reactors later.

Illustration: a satellite gateway pad in gold wireframe, a large dish, a flat-panel array and an equipment shelter
6

Xalant Communications

Ka-band satellite community gateways bringing high-capacity internet to underserved markets.

Nothing is operating yet. Group forming in 2026 (target Q3, may move to Q4). South Oregon proof-of-concept build-out starts Q1 2027. Every date is a target.

xalant.net
Illustration: a cybernetic gorilla in chrome and gunmetal armor with a crimson chest plate and a tinted visor, facing left on navy
CAYC
Web3 exchange and real-world gaming

Cyber Ape Yacht Club, Web3 studio and marketplace.

Cyber Ape Yacht Club, Eight Galaxies' Web3 studio and marketplace: the commerce layer that monetizes the ecosystem and extends it into the physical world.

7

CAYC Exchange

Screenshot: the CAYC Exchange trading view, a BTC/USDT perpetual candlestick chart with the order book, recent trades, a buy and sell panel and the transaction history Trading view (screenshot)

Digital-asset exchange and marketplace for trading, rewards and the ecosystem's Web3 economy.

LIVE Created May 2022Live
Live at cayc.exchange
7 8
8

CAYC Island

Illustration, not the property: an aerial view of an undeveloped tropical island at dawn with a white beach and reef Illustration, not the property

Flagship real-life gaming destination: a 400-acre private island off Belize, bridging the virtual worlds into physical experiences.

PLANNED Escrow recorded Apr 2026
GambleStakes, the Web3 casino, is on hold until 2027 and folds in under CAYC Island. Title outcome unreported in any later source. No public site yet.

How the parts turn

Xalant powers the platform; Ultra fuels the demand; CAYC monetizes at the crossing. Ultra is Xalant's intended first customer

1Xalant powers the platform (planned) 2Ultra fuels the demand 3CAYC monetizes at the crossingXALANT, the baseULTRA, the upper loopCAYC, the junction
  1. Xalant powers the platform
    Lower loop to the junction: off-grid power, edge compute and connectivity, all Planned; Ultra is the intended first customer.
  2. Ultra fuels the demand
    Upper loop: Ultra fuels Xalant's compute and turns power and compute into worlds, players and audiences.
  3. CAYC monetizes at the crossing
    The junction: the exchange and marketplace monetize the ecosystem and carry it into the physical world
  4. .
Section view

Roadmap

Everything past the today line is a target, not a commitment.

2022 2023 2024 2025 2026 2027 2028 Half-year ticks EIGHT GALAXIES (GROUP) Development begins, about 2022. Source: Company overview; year only Development begins, about 2022 May 2025 roadmap, May 2025. Source: 8G High Level Roadmap, internal deck, May 2025May 2025 roadmap, May 2025 ULTRA, 3 PARTS 1 Ultra Kingdoms PUBLIC BETA Public beta, 17 Jul 2026. Source: Public beta announcement, 17 Jul 2026Public beta, 17 Jul 2026 Day-13 report, 29 Jul 2026. Source: Ultra Kingdoms Day-13 report, 29 Jul 2026Day-13 report, 29 Jul 2026 i-gaming in beta, Sep 2026 to Oct 2026. Source: July 2026 plan, weeks 9 to 12: i-gaming modules in beta i-gaming in beta, Sep 2026 to Oct 2026 Commercial launch, 24 Oct 2026. Source: July 2026 plan; target 24 Oct 2026Commercial launch, 24 Oct 2026 2 Ultra Ads IN DEVELOPMENT Advertiser pilot during beta, outcome unreported, Aug 2026 to Sep 2026. Source: July 2026 plan, beta weeks 5 to 8; target; no later report Advertiser pilot during beta, outcome unreported, Aug 2026 to Sep 2026 Live with commercial launch, 24 Oct 2026. Source: July 2026 plan; targetLive with commercial launch, 24 Oct 2026 3 Ultra Data PUBLIC BETA Pipeline live in beta, 17 Jul 2026. Source: July 2026 plan: instrumentation and attribution pipeline live inside the public beta, 17 Jul 2026Pipeline live in beta, 17 Jul 2026 Audience products validated, through the beta, Aug to Oct 2026. Source: July 2026 plan; through the beta, no separate date Audience products validated, through the beta, Aug to Oct 2026 XALANT, 3 PARTS 4 Xalant Edge PLANNED Group formation, Q3 to Q4 2026. Source: xalant.net, 11 Sep 2026: target Q3, may move to Q4 Group formation, Q3 to Q4 2026 Deployment playbook, Aug 2026. Source: Xalant Playbook Build Plan, Aug 2026, internalDeployment playbook, Aug 2026 Series A close and Oregon POC buildout, Q3 2026. Source: Executive Summary, 2026: Q3 2026Series A close and Oregon POC buildout, Q3 2026 South Oregon proof-of-concept build-out starts, Q1 2027. Source: xalant.net, 11 Sep 2026: Q1 2027South Oregon proof-of-concept build-out starts, Q1 2027 Next three centers, 2027 to 2028. Source: xalant.net, 11 Sep 2026: 2027 to 2028 Next three centers, 2027 to 2028 5 Xalant Power PLANNED Build-out start, Q1 2027. Source: xalant.net, 11 Sep 2026: Q1 2027Build-out start, Q1 2027 First bridge power, about Q1 2028. Source: xalant.net, 11 Sep 2026: about one year after build start First bridge power, about Q1 2028 6 Xalant Communications PLANNED Workstream begins, Mar 2025. Source: xalant.net communications page, 11 Sep 2026Workstream begins, Mar 2025 First gateway with the South Oregon site, Q1 2027. Source: xalant.net, 11 Sep 2026: Q1 2027First gateway with the South Oregon site, Q1 2027 CAYC, 2 PARTS 7 CAYC Exchange LIVE Created, 24 May 2022. Source: CAYC Exchange record, 24 May 2022Created, 24 May 2022 Live, confirmed 17 Sep 2026. Source: Owner confirmation, 17 Sep 2026; an automated fetch on 15 Sep 2026 saw a blank app shellLive, confirmed 17 Sep 2026 8 CAYC Island PLANNED Escrow recorded, Apr 2026. Source: April 2026 newsletter; title outcome unreportedEscrow recorded, Apr 2026 Build-out, late 2026 to 2027. Source: Company overview: after Series A, late 2026 to 2027 Build-out, late 2026 to 2027 GambleStakes folds in, 2027. Source: Owner statement, 17 Sep 2026GambleStakes folds in, 2027 TODAY 17 SEP 2026 past this line: targets
  • Dated evidence
  • Approximate date
  • Target
  • Target range
  • Bar in the assembly's material
EIGHT GALAXIES (GROUP)
  • Development begins, about 2022Company overview; year only
  • May 2025 roadmap, May 20258G High Level Roadmap, internal deck, May 2025
TODAY 17 SEP 2026 past this line: targets
ULTRA, 3 parts
1 Ultra Kingdoms
PUBLIC BETA
  • Public beta, 17 Jul 2026Public beta announcement, 17 Jul 2026
  • Day-13 report, 29 Jul 2026Ultra Kingdoms Day-13 report, 29 Jul 2026
  • i-gaming in beta, Sep 2026 to Oct 2026July 2026 plan, weeks 9 to 12: i-gaming modules in beta
  • Commercial launch, 24 Oct 2026 (target)July 2026 plan; target 24 Oct 2026
2 Ultra Ads
IN DEVELOPMENT
  • Advertiser pilot during beta, outcome unreported, Aug 2026 to Sep 2026July 2026 plan, beta weeks 5 to 8; target; no later report
  • Live with commercial launch, 24 Oct 2026 (target)July 2026 plan; target
3 Ultra Data
PUBLIC BETA
  • Pipeline live in beta, 17 Jul 2026July 2026 plan: instrumentation and attribution pipeline live inside the public beta, 17 Jul 2026
  • Audience products validated, through the beta, Aug to Oct 2026July 2026 plan; through the beta, no separate date
XALANT, 3 parts
4 Xalant Edge
PLANNED
  • Group formation, Q3 to Q4 2026xalant.net, 11 Sep 2026: target Q3, may move to Q4
  • Deployment playbook, Aug 2026Xalant Playbook Build Plan, Aug 2026, internal
  • Series A close and Oregon POC buildout, Q3 2026 (target)Executive Summary, 2026: Q3 2026
  • South Oregon proof-of-concept build-out starts, Q1 2027 (target)xalant.net, 11 Sep 2026: Q1 2027
  • Next three centers, 2027 to 2028 (target)xalant.net, 11 Sep 2026: 2027 to 2028
5 Xalant Power
PLANNED
  • Build-out start, Q1 2027 (target)xalant.net, 11 Sep 2026: Q1 2027
  • First bridge power, about Q1 2028 (target)xalant.net, 11 Sep 2026: about one year after build start
6 Xalant Communications
PLANNED
  • Workstream begins, Mar 2025xalant.net communications page, 11 Sep 2026
  • First gateway with the South Oregon site, Q1 2027 (target)xalant.net, 11 Sep 2026: Q1 2027
CAYC, 2 parts
7 CAYC Exchange
LIVE
  • Created, 24 May 2022CAYC Exchange record, 24 May 2022
  • Live, confirmed 17 Sep 2026Owner confirmation, 17 Sep 2026; an automated fetch on 15 Sep 2026 saw a blank app shell
8 CAYC Island
PLANNED
  • Escrow recorded, Apr 2026April 2026 newsletter; title outcome unreported
  • Build-out, late 2026 to 2027 (target)Company overview: after Series A, late 2026 to 2027
  • GambleStakes folds in, 2027 (target)Owner statement, 17 Sep 2026
Roadmap

Eight Galaxies

Founded by Dru Mundorff and Mark Chester.

Eight Galaxies

The parent entity and publisher: three brands, eight businesses.

Principals
  • Dru Mundorff, CEO and Founder
  • Mark Chester, CFO and Co-Founder
Offices
  • Delaware, USA registered
  • Locations in Phoenix AZ, Atlanta GA, Cyprus, Belize
Message
Enter your name so we know who is writing.
Enter a valid email address so we can reply.
Write a message of at least ten characters.
Sent
Notes
  1. GambleStakes, the Web3 casino, is on hold until 2027 and folds in under CAYC Island.
  2. Three global technology patents are held by Eight Galaxies (App. 63/450,285).
Revision
17 Sep 2026

The machined Eight Galaxies mark on the drafting table beside its own exploded drawing   © 2026 Eight Galaxies. All rights reserved.
Title block